Home »Ease Of Doing Business

Ease Of Doing Business

Sl.NoRecommendation
280 Ensure that DisComs uses automated tools to monitor outages in all Industrial areas of State
281 Ensure that DisComs uses automated tools for service restoration in all Industrial areas of State
282 Ensure that the regulator publishes monthly or quarterly the data regarding total duration and frequency of outages online in public domain
283 Ensure that total outage cap is fixed by regulator for a quarter/year and the Discoms compensates customers for outages that go over the fixed cap automatically
1. Discoms implementing Standards of Performance framed by Hon'ble ERC.
2. Based on the representations of the consumers/CGRF/Vidyut Ombudsman/Courts will finalize the compensation if the    Outages exceeds over the cap.
284 Ensure that information on effective tariffs are available online, and that customers are notified of a
change in tariff ahead of the billing cycle
285 Reduce the number of documents required for obtaining the electricity connection to only 2, namely proof of
ownership/occupancy and authorization document (in case of firm/company)
286 Allow third party inspection of internal installations and ensure that majority of establishments avail this provision
1.Self Certification Instructions.
2.Form 1 and 2.
287 Ensure that users are provided a fixed cost estimate based on the load (KVA/KW) required for obtaining electricity connection in all industrial areas of State and ensure these charges (demand note) is generated through the online system
288 Implement a system that allows online application submission, payment and tracking of status without the need for a physical touch point for document submission for new electricity connection and mandate that all applications are submitted online
1. Instruction on submission of application through on-line
2. On-line Application submission
289 Stipulate that charged electrical connections (up to 150 KVA) is provided within seven days where no Right of Way is required and in Fifteen days where RoW is required from concerned agencies
292 Allow third parties to easily verify the authenticity of electricity connections and respective premise/entity/individual through online system in the public domain
352 Approvals required for starting business operations
354 Single window Portal for pre-establishment of business/Industrial Unit
409-414 Taxes and Duties on Electricity of TSSPDCL
416 Publish tariff rates on the portal of DISCOMs for new connection and all types of users
1.DC and SD Charges
2.Cost Data FY2016-17
417 Design an online system for e-payment of bills on the portal of DISCOMs