Progress wise Report Summary of NET Metering

TSSPDCL » Circle :
SL.NO Circle Total NET Meter
Registrations
Total NET Meter
Proposed Capacity
( in KW)
Technical Feasibility Issued
for No. of Registrations
Technical Feasibility Issued
for Total Proposed Capacity( in KW)
Registrations
Yet To be Released
Capacity Yet To be
Released
( in KW)
Released Released
Capacity ( in KW)
1 2 3=(7+9) 4=(8+10) 5 6 7 8 9 10
1 HYDERABAD CENTRAL 136 2594 133 2457 48 1267 88 1327
2 HYDERABAD NORTH 496 6647.5 485 6093.5 142 2903 354 3744.5
3 HYDERABAD SOUTH 85 2248 81 2133 37 813 48 1435
4 MAHABOOBNAGAR 57 5252.4 50 1219.4 46 4523 11 729.4
5 MEDAK 67 4981 56 4870 35 3549 32 1432
6 NALGONDA 41 1980 40 1955 16 863 25 1117
7 RANGA REDDY EAST 267 6251.5 260 5423.5 127 5001 140 1250.5
8 RANGA REDDY NORTH 232 8931.5 218 7358.5 129 6946.5 103 1985
9 RANGA REDDY SOUTH 219 6414 210 5733 59 2521 160 3893
10 SIDDIPET 8 400 6 385 7 395 1 5
11 TOTAL 1608 45699.9 1539 37627.9 646 28781.5 962 16918.4