Progress wise Report Summary of NET Metering

TSSPDCL » Circle :
SL.NO Circle Total NET Meter
Registrations
Total NET Meter
Proposed Capacity
( in KW)
Technical Feasibility Issued
for No. of Registrations
Technical Feasibility Issued
for Total Proposed Capacity( in KW)
Registrations
Yet To be Released
Capacity Yet To be
Released
( in KW)
Released Released
Capacity ( in KW)
1 2 3=(7+9) 4=(8+10) 5 6 7 8 9 10
1 HYDERABAD CENTRAL 125 2387 124 2386 51 1259 74 1128
2 HYDERABAD NORTH 464 5732.5 453 5496.5 143 2312 321 3420.5
3 HYDERABAD SOUTH 69 2180 66 2076 26 1352 43 828
4 MAHABOOBNAGAR 54 5148.4 41 1037.4 45 4886.5 9 261.9
5 MEDAK 59 2764 49 2688 41 2370 18 394
6 NALGONDA 38 1847 35 1831 18 1086 20 761
7 RANGA REDDY EAST 230 4727.5 223 4101.5 109 3786 121 941.5
8 RANGA REDDY NORTH 192 6498.5 181 6280.5 99 4805.5 93 1693
9 RANGA REDDY SOUTH 205 5378 192 5274 56 1546 149 3832
10 SIDDIPET 5 285 4 275 4 280 1 5
11 TOTAL 1441 36947.9 1368 31445.9 592 23683 849 13264.9